+86 021-57676786 News Center Careers

FAQ

Frequently Asked Questions

All Product Parts Procurement Installation Certification Shipping After-Sales
Create a compliance table covering technical scope, exclusions, standards, components, delivery, installation, warranty and lifecycle support rather than comparing price alone.
Define the scope for the controller, drive, operating panels, sensors and wiring. A system diagram and floor schedule help establish the interfaces and supply boundaries.
A package may include declarations, certificates, test reports, component lists, drawings, calculations, manuals, risk documentation and inspection records, depending on the market.
Response depends on part identification, stock, customization and shipping method. Keeping project-specific critical spares is the best way to reduce downtime.
Provide package count, dimensions, gross weight, pickup location, destination, trade terms, cargo readiness date and any special handling requirements.
Elevators and certain safety components placed on the EU market generally require conformity assessment under applicable EU legislation before CE marking and market placement.
Remote diagnosis can be provided through documents, photos, video calls and controller data. Safe on-site tests must be performed by qualified personnel.
Often yes, but the replacement must match function, dimensions, electrical ratings, communication protocol, mounting and safety requirements. A technical review is required before an equivalent is approved.