Frequently Asked Questions

All Product Parts Procurement Installation Certification Shipping After-Sales
Handover normally includes test records, certificates, as-built drawings, manuals, parameter backups, keys, spare parts and training documentation.
Review rail alignment, guide systems, balance, suspension, drive tuning, acceleration, leveling and mechanical vibration using measured results.
Qualified local teams can install with approved drawings, manuals, training and technical support, subject to local licensing and inspection rules.
Use controlled access, fall protection, lockout, lifting plans, certified equipment, shaft protection, competent supervision and approved work procedures.
Confirm openings, sill levels, frames, wall finishes, fire rating, protection and sequencing before completing adjacent architectural work.
The method depends on the installation system and local safety rules. Scaffoldless methods still require approved platforms, anchors and fall protection.
Common causes include incomplete shafts, dimension errors, missing power, late finishes, inaccessible equipment, document changes and inspection scheduling.
Record the deviation, assess safety and function, obtain engineering approval, update drawings and verify corrective work before proceeding.