Responsibility varies by market and contract and may involve the manufacturer, installer, authorized representative, notified body, inspection agency or local authority.
Some documents cover a product type, while project records and final inspections identify individual units by serial number. The traceability method depends on the scheme.
Review contract dates, transition rules, authority requirements and design status. The parties should document whether redesign, retesting or additional approval is necessary.
It may be possible, but differences between standards can require design changes and additional testing. A compliance matrix should be prepared before confirming the configuration.
State the destination, applicable code and edition, required certificates, issuing-body expectations, document language, inspection stages and responsibility for local approval.
Type examination evaluates a representative design against specified requirements. Production items must remain consistent with the approved type and any surveillance conditions.
Third-party inspection may be required by law, contract, buyer policy or financing terms. The inspection scope and witness points should be agreed before production.
It is a manufacturer or responsible party statement identifying the product, applicable legislation and standards, signatory and conformity responsibility. It is not a substitute for required third-party certification.