+86 021-57676786 News Center Careers

FAQ

Frequently Asked Questions

All Product Parts Procurement Installation Certification Shipping After-Sales
Maintain critical spares, current backups and drawings; monitor recurring faults; train technicians; and establish clear escalation and shipping procedures.
Features may include suitable door widths, handrails, braille, audible announcements, accessible controls, mirrors and accurate leveling.
It may be possible, but differences between standards can require design changes and additional testing. A compliance matrix should be prepared before confirming the configuration.
Buy from traceable suppliers, verify labels and serial numbers, request certificates where relevant, inspect packaging and compare critical specifications with manufacturer records.
It should show package number, contents, quantity, dimensions, net and gross weight, project reference and handling marks.
Samples are often possible for standard parts. Custom tooling, software-locked boards, minimum production quantities or dangerous-goods shipping may affect availability and cost.
Training can cover product structure, installation, commissioning, troubleshooting and maintenance, with scope adapted to the team and supplied equipment.
State the destination, applicable code and edition, required certificates, issuing-body expectations, document language, inspection stages and responsibility for local approval.
Contact via WhatsApp