+86 021-57676786 News Center Careers

FAQ

Frequently Asked Questions

All Product Parts Procurement Installation Certification Shipping After-Sales
Preliminary layouts may be available for planning, but approved production drawings normally follow confirmed specifications and commercial agreement.
A component certificate may support multiple projects only within its approved scope. Project-specific design, installation, local authority and final inspection requirements still apply.
Record the complete switch code, actuator shape, mounting-hole spacing, contact arrangement and electrical rating. Include its exact function and the original wiring reference. A position limit, door switch and final limit may have different requirements even when their housings look similar.
Check the issuing body, certificate number, holder, product model, standard edition, validity, annexes and online verification channel. Confirm that the supplied product matches the certified configuration.
Keep approved drawings, manuals, method statements, risk assessments, inspection plans, certificates, test forms and revision-controlled technical data.
Display is grouped for the elevator or escalator function represented by the listed product options. Confirm the exact model and application before selection.
Common documents include commercial invoice, packing list, bill of lading, certificate of origin and required compliance or customs documents.
Hydraulic elevators may suit low-rise travel, heavy loads and certain layouts, subject to speed, energy, pit, temperature and environmental considerations.