Frequently Asked Questions

All Product Parts Procurement Installation Certification Shipping After-Sales
Typical stages include survey, guide rails, machine and suspension, entrances, car and counterweight, wiring, adjustment, testing and handover.
Use a dry, secure and organized area near the shaft, preserve package labels, protect electronics and finishes, and separate equipment by elevator and installation sequence.
Transit time depends on route, carrier, port congestion, customs and inland delivery. Include buffer time because published schedules are not guaranteed.
Confirm door opening width and height, opening type, panel weight, motor voltage, controller interface, mechanical dimensions and operating speed before selecting a door operator.
Support may be possible when adequate drawings, parameters, access rights and component information are available, but proprietary systems may limit diagnosis or replacement options.
LOP is grouped for the elevator or escalator function represented by the listed product options. Confirm the exact model and application before selection.
Provide the cabin layout, panel dimensions, floor schedule, button arrangement, display requirements and controller interface. Include finishes, access control and emergency communication provisions. For a ZH-ENG RFQ, separate the panel enclosure from the electrical components and wiring that must be included.
Customization can include car size, capacity, doors, finishes, controls, signals and special functions, within engineering, code and manufacturing limits.