PI-SH202406OV1096

Bangladesh

Fiche projet

Date de commande
2024-06-25
Zone de livraison
Bangladesh
Client
Sojib Khan
Port de destination
CHITTAGONG
Quantité projet
50.0000
Montant total
$33250.00
Avertissement confidentialité
Tous les coordonnées et tarifs clients sont anonymisés

Produits utilisés sur ce projet

Image Nom produit Caractéristiques Quantité
Elevator COP Elevator COP Attached Drawing 5.0000
Elevator COP Elevator COP Attached Drawing 5.0000
Elevator COP Elevator COP Attached Drawing 5.0000
Elevator COP Elevator COP Attached Drawing 5.0000
Elevator COP Elevator COP Attached Drawing 5.0000
Elevator COP Elevator COP Attached Drawing 5.0000
Elevator COP Elevator COP Attached Drawing 5.0000
Elevator COP Elevator COP Attached Drawing 5.0000
Elevator COP Elevator COP Attached Drawing 5.0000
Elevator COP Elevator COP Attached Drawing 5.0000

Avis clients

Sojib Khan

I was really surprised by the energy efficiency of this elevator. It is quiet and saves electricity. It is not difficult to use air conditioning in summer, and it is very cost-effective.

2024-08-05 16:00:00.0
ZH-ENG Admin Reply: Thanks for the approval! We have always paid attention to the energy-saving and quiet design of our products, and bringing you a satisfactory user experience is our greatest driving force. I wish you a happy life!
2024-08-06 17:00:54.0
Retour à la liste des projets
Contact via WhatsApp