+86 021-5767686 Haber Merkezi Kariyer

PI-SH202406OV1096

Bangladesh

Proje Özeti

Sipariş Tarihi
2024-06-25
Teslimat Bölgesi
Bangladesh
Müşteri
Sojib Khan
Hedef Liman
CHITTAGONG
Proje Miktarı
50.0000
Toplam Tutar
$33250.00
Gizlilik Uyarısı
Tüm müşteri iletişim ve fiyat verileri anonimleştirildi

Bu Projede Kullanılan Ürünler

Görsel Ürün Adı Teknik Özellikler Miktar
Elevator COP Elevator COP Attached Drawing 5.0000
Elevator COP Elevator COP Attached Drawing 5.0000
Elevator COP Elevator COP Attached Drawing 5.0000
Elevator COP Elevator COP Attached Drawing 5.0000
Elevator COP Elevator COP Attached Drawing 5.0000
Elevator COP Elevator COP Attached Drawing 5.0000
Elevator COP Elevator COP Attached Drawing 5.0000
Elevator COP Elevator COP Attached Drawing 5.0000
Elevator COP Elevator COP Attached Drawing 5.0000
Elevator COP Elevator COP Attached Drawing 5.0000

Müşteri Yorumları

Sojib Khan

I was really surprised by the energy efficiency of this elevator. It is quiet and saves electricity. It is not difficult to use air conditioning in summer, and it is very cost-effective.

2024-08-05 16:00:00.0
ZH-ENG Admin Reply: Thanks for the approval! We have always paid attention to the energy-saving and quiet design of our products, and bringing you a satisfactory user experience is our greatest driving force. I wish you a happy life!
2024-08-06 17:00:54.0
Tüm Projelere Dön
Contact via WhatsApp