+86 021-57676786 新闻中心 招贤纳士

PI-SH202406OV1096

Bangladesh

项目概况

签约日期
2024-06-25
交付地区
Bangladesh
合作客户
Sojib Khan
目的港口
CHITTAGONG
项目采购数量
50.0000
项目总金额
$33250.00
隐私说明
所有客户联系方式、详细报价信息均做脱敏隐藏保护

本项目包含产品

图片 产品名称 规格参数 数量
Elevator COP Elevator COP Attached Drawing 5.0000
Elevator COP Elevator COP Attached Drawing 5.0000
Elevator COP Elevator COP Attached Drawing 5.0000
Elevator COP Elevator COP Attached Drawing 5.0000
Elevator COP Elevator COP Attached Drawing 5.0000
Elevator COP Elevator COP Attached Drawing 5.0000
Elevator COP Elevator COP Attached Drawing 5.0000
Elevator COP Elevator COP Attached Drawing 5.0000
Elevator COP Elevator COP Attached Drawing 5.0000
Elevator COP Elevator COP Attached Drawing 5.0000

客户评价

Sojib Khan

I was really surprised by the energy efficiency of this elevator. It is quiet and saves electricity. It is not difficult to use air conditioning in summer, and it is very cost-effective.

2024-08-05 16:00:00.0
ZH-ENG Admin Reply: Thanks for the approval! We have always paid attention to the energy-saving and quiet design of our products, and bringing you a satisfactory user experience is our greatest driving force. I wish you a happy life!
2024-08-06 17:00:54.0
返回全部项目
Contact via WhatsApp