+86 021-57678686 Centro Notizie Lavora con noi

PI-SH202406OV1096

Bangladesh

Panoramica progetto

Sign Date
2024-06-25
Area consegna
Bangladesh
Cliente
Sojib Khan
Porto destinazione
CHITTAGONG
Quantità progetto
50.0000
Importo totale
$33250.00
Avviso privacy
Tutti contatti e prezzi clienti anonimizzati

Prodotti utilizzati nel progetto

Immagine Nome prodotto Specifiche Quantità
Elevator COP Elevator COP Attached Drawing 5.0000
Elevator COP Elevator COP Attached Drawing 5.0000
Elevator COP Elevator COP Attached Drawing 5.0000
Elevator COP Elevator COP Attached Drawing 5.0000
Elevator COP Elevator COP Attached Drawing 5.0000
Elevator COP Elevator COP Attached Drawing 5.0000
Elevator COP Elevator COP Attached Drawing 5.0000
Elevator COP Elevator COP Attached Drawing 5.0000
Elevator COP Elevator COP Attached Drawing 5.0000
Elevator COP Elevator COP Attached Drawing 5.0000

Recensioni clienti

Sojib Khan

I was really surprised by the energy efficiency of this elevator. It is quiet and saves electricity. It is not difficult to use air conditioning in summer, and it is very cost-effective.

2024-08-05 16:00:00.0
ZH-ENG Admin Reply: Thanks for the approval! We have always paid attention to the energy-saving and quiet design of our products, and bringing you a satisfactory user experience is our greatest driving force. I wish you a happy life!
2024-08-06 17:00:54.0
Torna a tutti i progetti
Contact via WhatsApp