+86 021-57676786 News Center Careers

FAQ

Frequently Asked Questions

All Product Parts Procurement Installation Certification Shipping After-Sales
Requirements include main and temporary power, voltage, frequency, phase, capacity, grounding, protection and lighting as defined in the electrical drawings.
Duration depends on floors, elevator type, site readiness, crew, logistics, inspection and commissioning. A project-specific program should be agreed.
Required dimensions depend on car size, capacity, speed, door arrangement, counterweight position, clearances and applicable code. Use approved project drawings.
Verify approved drawings, shaft dimensions, pit and overhead, openings, structure, power, access, storage, lifting provisions and site readiness.
Contact via WhatsApp