Tests may cover brakes, safety gear, governor, buffers, doors, leveling, alarms, emergency operation, loads, ride quality and code-specific functions.
Commissioning requires completed installation, correct wiring, parameter setup, safety-circuit verification, functional tests, load tests and documented results.
Rails are installed to approved brackets and aligned with calibrated instruments within specified tolerances, then checked under relevant installation and code requirements.
Only limited preparation should begin unless the shaft is safe, dimensionally accepted and protected. Premature work increases damage, delay and rework.
Typical stages include survey, guide rails, machine and suspension, entrances, car and counterweight, wiring, adjustment, testing and handover.
Use a dry, secure and organized area near the shaft, preserve package labels, protect electronics and finishes, and separate equipment by elevator and installation sequence.
Keep approved drawings, manuals, method statements, risk assessments, inspection plans, certificates, test forms and revision-controlled technical data.
The contract should assign civil works, openings, embedded items, waterproofing, power, scaffolding, lifting and corrections between the builder and elevator contractor.