Rails are installed to approved brackets and aligned with calibrated instruments within specified tolerances, then checked under relevant installation and code requirements.
Only limited preparation should begin unless the shaft is safe, dimensionally accepted and protected. Premature work increases damage, delay and rework.
Use a dry, secure and organized area near the shaft, preserve package labels, protect electronics and finishes, and separate equipment by elevator and installation sequence.
The contract should assign civil works, openings, embedded items, waterproofing, power, scaffolding, lifting and corrections between the builder and elevator contractor.