PI-SH202407RL0232

Bangladesh

プロジェクト概要

受注日
2024-07-14
納品地域
Bangladesh
取引先
CREST ASSIK
仕向港
プロジェクト数量
34.0000
総金額
$764.50
プライバシー注意
顧客連絡先・詳細価格は匿名化処理済み

本プロジェクト採用製品

画像 製品名 仕様 数量
Elevator COP Elevator COP Attached Drawing 1.0000
Elevator LOP Elevator LOP Attached Drawing 1.0000
Elevator LOP Elevator LOP Attached Drawing 8.0000
Elevator LOP Elevator LOP Attached Drawing 1.0000
Elevator COP Elevator COP Attached Drawing 1.0000
Elevator LOP Elevator LOP Attached Drawing 1.0000
Elevator LOP Elevator LOP Attached Drawing 4.0000
Elevator LOP Elevator LOP Attached Drawing 1.0000
Elevator COP Elevator COP Attached Drawing 1.0000
Elevator LOP Elevator LOP Attached Drawing 1.0000
Elevator LOP Elevator LOP Attached Drawing 5.0000
Elevator LOP Elevator LOP Attached Drawing 1.0000
Emergency Stop Button Emergency Stop Button (Led red – 500)(Led green – 300) 8.0000

顧客レビュー

CREST LIFT

The energy efficiency of this elevator is really good. The COP value is quite high, and it is power-saving and quiet.

2024-08-14 16:00:00.0
ZH-ENG Admin Reply: Thanks for the approval! We have always paid attention to the energy-saving and quiet performance of our products, and we are happy that you are satisfied. If you have any needs, please feel free to contact us!
2024-08-15 21:00:33.0
全プロジェクト一覧へ戻る
Contact via WhatsApp