+86 021-5767686 Haber Merkezi Kariyer

PI-SH202407RL0232

Bangladesh

Proje Özeti

Sipariş Tarihi
2024-07-14
Teslimat Bölgesi
Bangladesh
Müşteri
CREST ASSIK
Hedef Liman
Proje Miktarı
34.0000
Toplam Tutar
$764.50
Gizlilik Uyarısı
Tüm müşteri iletişim ve fiyat verileri anonimleştirildi

Bu Projede Kullanılan Ürünler

Görsel Ürün Adı Teknik Özellikler Miktar
Elevator COP Elevator COP Attached Drawing 1.0000
Elevator LOP Elevator LOP Attached Drawing 1.0000
Elevator LOP Elevator LOP Attached Drawing 8.0000
Elevator LOP Elevator LOP Attached Drawing 1.0000
Elevator COP Elevator COP Attached Drawing 1.0000
Elevator LOP Elevator LOP Attached Drawing 1.0000
Elevator LOP Elevator LOP Attached Drawing 4.0000
Elevator LOP Elevator LOP Attached Drawing 1.0000
Elevator COP Elevator COP Attached Drawing 1.0000
Elevator LOP Elevator LOP Attached Drawing 1.0000
Elevator LOP Elevator LOP Attached Drawing 5.0000
Elevator LOP Elevator LOP Attached Drawing 1.0000
Emergency Stop Button Emergency Stop Button (Led red – 500)(Led green – 300) 8.0000

Müşteri Yorumları

CREST LIFT

The energy efficiency of this elevator is really good. The COP value is quite high, and it is power-saving and quiet.

2024-08-14 16:00:00.0
ZH-ENG Admin Reply: Thanks for the approval! We have always paid attention to the energy-saving and quiet performance of our products, and we are happy that you are satisfied. If you have any needs, please feel free to contact us!
2024-08-15 21:00:33.0
Tüm Projelere Dön
Contact via WhatsApp