PI-SH202404YL0414

United Arab Emirates

プロジェクト概要

受注日
2024-04-18
納品地域
United Arab Emirates
取引先
WAGDI
仕向港
プロジェクト数量
1104.0000
総金額
$7735.00
プライバシー注意
顧客連絡先・詳細価格は匿名化処理済み

本プロジェクト採用製品

画像 製品名 仕様 数量
Elevator Wire Rope Elevator Wire Rope Natural Fiber Core 8MM 1000.0000
Solid Guide Rail Solid Guide Rail T75-3/B 75*62*10mm, Sunny brand, each set 5m,with 1 Fishplate, 4 pcs of rail clip, and 8pcs of bolts 50.0000
Hollow Guide Rail Hollow Guide Rail TK5A2.75 78*60*16.4mm, Sunny brand, each set 5m.with 1 Fishplate, 6 pcs of rail clip, and 14pcs of bolts 50.0000
Traction Machine Traction Machine TORIN, 2:1, 630KG 1.0M/S 3.9KW, pulley φ400mm, 4×φ10×16 include 1387 encoder, 7m cable, Monarch system, MR, gray colour 2.0000
Traction Machine Traction Machine TORIN, 2:1, 800KG 1.0M/S 5.0KW, pulley φ400mm, 5×φ10×16 include 1387 encoder, 7m cable, Monarch system, MR, gray colour 1.0000
Electric Parts Electric Parts 3phase 380V, 4th generation MR control whole electric packaging, Use for passenger elevator, ARD, including Electrical release device and keypad, 7.5KW 3 Floors(G, 1-2) 1.0000

顧客レビュー

WAGDI

يتميز حبل سلك المصعد هذا بجودة صلبة جدًا، وآمن جدًا للاستخدام، كما أن سيد التثبيت محترف أيضًا، والتأثير العام جيد.

2024-05-21 16:00:00.0
ZH-ENG Admin Reply: شكرًا لك على موافقتك. لقد أولينا اهتمامًا دائمًا بجودة المنتج وتفاصيل الخدمة، ويسعدنا رضاك. إذا كنت بحاجة إلى مزيد من الدعم، فلا تتردد في الاتصال بنا!
2024-05-22 19:01:03.0
全プロジェクト一覧へ戻る
Contact via WhatsApp