+86 021-57676786 News Center Careers

PI-SH202404YL0414

United Arab Emirates

Project Overview

Sign Date
2024-04-18
Delivery Region
United Arab Emirates
Client
WAGDI
Destination Port
Project Quantity
1104.0000
Total Value
$7735.00
Privacy Notice
All client contact & pricing data is anonymized

Products In This Project

Image Product Name Specifications Quantity
Elevator Wire Rope Elevator Wire Rope Natural Fiber Core 8MM 1000.0000
Solid Guide Rail Solid Guide Rail T75-3/B 75*62*10mm, Sunny brand, each set 5m,with 1 Fishplate, 4 pcs of rail clip, and 8pcs of bolts 50.0000
Hollow Guide Rail Hollow Guide Rail TK5A2.75 78*60*16.4mm, Sunny brand, each set 5m.with 1 Fishplate, 6 pcs of rail clip, and 14pcs of bolts 50.0000
Traction Machine Traction Machine TORIN, 2:1, 630KG 1.0M/S 3.9KW, pulley φ400mm, 4×φ10×16 include 1387 encoder, 7m cable, Monarch system, MR, gray colour 2.0000
Traction Machine Traction Machine TORIN, 2:1, 800KG 1.0M/S 5.0KW, pulley φ400mm, 5×φ10×16 include 1387 encoder, 7m cable, Monarch system, MR, gray colour 1.0000
Electric Parts Electric Parts 3phase 380V, 4th generation MR control whole electric packaging, Use for passenger elevator, ARD, including Electrical release device and keypad, 7.5KW 3 Floors(G, 1-2) 1.0000

Client Reviews

WAGDI

يتميز حبل سلك المصعد هذا بجودة صلبة جدًا، وآمن جدًا للاستخدام، كما أن سيد التثبيت محترف أيضًا، والتأثير العام جيد.

2024-05-21 16:00:00.0
ZH-ENG Admin Reply: شكرًا لك على موافقتك. لقد أولينا اهتمامًا دائمًا بجودة المنتج وتفاصيل الخدمة، ويسعدنا رضاك. إذا كنت بحاجة إلى مزيد من الدعم، فلا تتردد في الاتصال بنا!
2024-05-22 19:01:03.0
View All Projects
Contact via WhatsApp