Follow the latest updates of ZH-ENG, learn about world-leading elevator technology and prefabricated solutions, and explore the future development of urban vertical transportation.
A Saskatchewan tender covers replacement of passenger elevators 5 and 6 at Royal University Hospital. Published milestones include site attendance, an alternates deadline and an October 2026 closing date.
France’s public procurement portal lists modernization of the principal elevator at the Arc de Triomphe. The heritage setting means access, fabric protection and surveyed interfaces must be coordinated with the lift package.
ProSet announced investment in equipment, field leadership, team capacity and operational infrastructure to support more permanent and relocatable modular projects nationwide.
New research argues that circularity and manufacturing-led design must be coordinated across the building lifecycle. Buyers need recoverable connections and material information.
A 2026 HUD-linked report proposes a strategy for expanding offsite housing. Exporters should distinguish factory productivity from the financing, permitting and site interfaces that determine delivery.
A Canadian consulting request notes prolonged water exposure around hydraulic cylinders. Buyers should separate condition diagnosis from premature equipment replacement decisions.
New York Tech’s Center for Offsite Construction is developing consensus requirements for structural and building-service interfaces. Buyers should make interface ownership explicit.
A European task force convened public, research and industry participants to examine barriers to industrialized construction. Suppliers should expect scrutiny of approval, interoperability and evidence.