PI-SH202208SC0412

Afghanistan

Fiche projet

Date de commande
2022-07-07
Zone de livraison
Afghanistan
Client
ARSH
Port de destination
ABBAS
Quantité projet
22.0000
Montant total
$10300.00
Avertissement confidentialité
Tous les coordonnées et tarifs clients sont anonymisés

Produits utilisés sur ce projet

Image Nom produit Caractéristiques Quantité
Elevator control cabinet Elevator control cabinet 11KW with pin and plug 220V 1P 5.0000
Elevator control cabinet Elevator control cabinet 15KW with pin and plug 220V 1P 5.0000
Elevator control cabinet Elevator control cabinet 18.5KW with pin and plug 220V 1P 1.0000
Monarch Car Top Inspection Box Monarch Car Top Inspection Box Monarch Car Top Inspection Box with Car top Board with pin and plug 11.0000

Avis clients

Arsh Asia Elevator Company

Just received the item, I am very satisfied. The quality of the item is good, the packaging is careful, it is not damaged at all, and the logistics are very fast, and it is highly recommended!

2022-08-22 16:00:00.0
ZH-ENG Admin Reply: Thanks for the great review! We are very happy that you are satisfied with the product and logistics, and we will continue to work hard to provide you with better service!
2022-08-23 17:01:20.0
Retour à la liste des projets
Contact via WhatsApp