+86 021-57676786 Nachrichtencenter Karriere

PI-SH202208SC0412

Afghanistan

Projektübersicht

Bestelldatum
2022-07-07
Lieferregion
Afghanistan
Kunde
ARSH
Zielhafen
ABBAS
Projektmenge
22.0000
Gesamtsumme
$10300.00
Datenschutzhinweis
Alle Kundenkontakt- und Preisdaten sind anonymisiert

In diesem Projekt enthaltene Produkte

Bild Produktname Spezifikation Menge
Elevator control cabinet Elevator control cabinet 11KW with pin and plug 220V 1P 5.0000
Elevator control cabinet Elevator control cabinet 15KW with pin and plug 220V 1P 5.0000
Elevator control cabinet Elevator control cabinet 18.5KW with pin and plug 220V 1P 1.0000
Monarch Car Top Inspection Box Monarch Car Top Inspection Box Monarch Car Top Inspection Box with Car top Board with pin and plug 11.0000

Kundenbewertungen

Arsh Asia Elevator Company

Just received the item, I am very satisfied. The quality of the item is good, the packaging is careful, it is not damaged at all, and the logistics are very fast, and it is highly recommended!

2022-08-22 16:00:00.0
ZH-ENG Admin Reply: Thanks for the great review! We are very happy that you are satisfied with the product and logistics, and we will continue to work hard to provide you with better service!
2022-08-23 17:01:20.0
Zurück zu allen Projekten
Contact via WhatsApp