+86 021-57676786 News Center Careers

PI-SH202303TH0617

Afghanistan

Project Overview

Sign Date
2023-03-30
Delivery Region
Afghanistan
Client
Sadiq
Destination Port
Project Quantity
531.0000
Total Value
$252026.00
Privacy Notice
All client contact & pricing data is anonymized

Products In This Project

Image Product Name Specifications Quantity
Centre Opening Landing Device Centre Opening Landing Device JJ:1200 1.0000
Light Curtain Light Curtain 154 beams 20.0000
Centre Opening Landing Device Centre Opening Landing Device JJ:700 with 304 panel and frame(参考图片) 20.0000
Centre Opening Landing Device Centre Opening Landing Device JJ:800with 304 panel and frame(参考图片) 20.0000
Centre Opening Landing Device Centre Opening Landing Device JJ:800 with 201 panel and frame(参考图片) 30.0000
Centre Opening Landing Device Centre Opening Landing Device JJ:700 with 201 panel and frame(参考图片) 30.0000
Traction Machine Traction Machine 630KG 1.0M/S 2:1 4.2KW 6.0000
Traction Machine Traction Machine 450KG 1.0M/S 2:1 3.1KW 4.0000
Guide Rail Guide Rail SN-T45/A pcs:1 Fish Plate-T45/Apcs: 1 T-Clips-T45/A pcs: 6 Bolts-T45/Apcs: 8 150.0000
Guide Rail Guide Rail SN-T70/4B pcs:1 Fish Plate-T70/4Bpcs: 1 T-Clips-T70/4B pcs: 6 Bolts-T70/4Bpcs: 8 150.0000
Guide Rail Guide Rail SN-T89/B pcs:1 Fish Plate-T89/Bpcs: 1 T-Clips-T89/B pcs: 6 Bolts-T89/Bpcs: 8 100.0000

Client Reviews

Sadiq

The guide rails of this elevator are installed very smoothly and run very smoothly. There is no noise at all. I feel that the quality is really good.

2023-04-29 16:00:00.0
ZH-ENG Admin Reply: Thanks for the approval! We have always paid attention to product quality and details, and we are happy that you are satisfied. If you need further support, feel free to contact us.
2023-04-30 21:00:57.0
View All Projects
Contact via WhatsApp