PI-SH202404YL0352

Bangladesh

परियोजना अवलोकन

हस्ताक्षर तिथि
2024-04-06
वितरण क्षेत्र
Bangladesh
ग्राहक
Capital lift
गंतव्य बंदरगाह
CHITTAGONG
परियोजना मात्रा
65000.0000
कुल मूल्य
$23675.00
गोपनीयता सूचना
सभी ग्राहक संपर्क और मूल्य निर्धारण डेटा अज्ञात है

इस परियोजना में उत्पाद

छवि प्रोडक्ट का नाम विशेष विवरण मात्रा
Elevator Wire Rope Elevator Wire Rope Natural Fiber Core 6.5MM with customized logo 20000.0000
Elevator Wire Rope Elevator Wire Rope Fiber Core 8MM with customized logo 5000.0000
Elevator Wire Rope Elevator Wire Rope Fiber Core 10MM with customized logo 40000.0000

ग्राहक समीक्षाएँ

Capital lift

The quality of this elevator wire rope is very real. After installation, it feels very stable, and the noise is quite low, so you can use it without worry.

2024-05-07 16:00:00.0
ZH-ENG Admin Reply: Thanks for the approval! We have always paid attention to product quality and user experience, and we are happy to bring you satisfactory use results. If you have any needs, please feel free to contact us!
2024-05-09 02:00:44.0
सभी प्रोजेक्ट देखें
Contact via WhatsApp