+86 021-57676786 Nachrichtencenter Karriere

PI-SH202404YL0352

Bangladesh

Projektübersicht

Bestelldatum
2024-04-06
Lieferregion
Bangladesh
Kunde
Capital lift
Zielhafen
CHITTAGONG
Projektmenge
65000.0000
Gesamtsumme
$23675.00
Datenschutzhinweis
Alle Kundenkontakt- und Preisdaten sind anonymisiert

In diesem Projekt enthaltene Produkte

Bild Produktname Spezifikation Menge
Elevator Wire Rope Elevator Wire Rope Natural Fiber Core 6.5MM with customized logo 20000.0000
Elevator Wire Rope Elevator Wire Rope Fiber Core 8MM with customized logo 5000.0000
Elevator Wire Rope Elevator Wire Rope Fiber Core 10MM with customized logo 40000.0000

Kundenbewertungen

Capital lift

The quality of this elevator wire rope is very real. After installation, it feels very stable, and the noise is quite low, so you can use it without worry.

2024-05-07 16:00:00.0
ZH-ENG Admin Reply: Thanks for the approval! We have always paid attention to product quality and user experience, and we are happy to bring you satisfactory use results. If you have any needs, please feel free to contact us!
2024-05-09 02:00:44.0
Zurück zu allen Projekten
Contact via WhatsApp