PI-SH202308SJ3221

Indonesia

Fiche projet

Date de commande
2023-08-14
Zone de livraison
Indonesia
Client
PT DWIANDRA CIPTA ANUGERAH RUKO
Port de destination
Quantité projet
697.0000
Montant total
$11009.98
Avertissement confidentialité
Tous les coordonnées et tarifs clients sont anonymisés

Produits utilisés sur ce projet

Image Nom produit Caractéristiques Quantité
Solid Guide Rail Solid Guide Rail SN-T75-3/B pcs:1 Fish Plate-T75-3/Bpcs: 1 T-Clips-T75-3/B pcs: 6 Bolts-T75-3/Bpcs: 8 40.0000
Traveling Cable Traveling Cable TVVBP 36*0.75+2*2P*0.75 500.0000
2-Leafs Side Opening Permanent Magnet Synchronous Door Operator 2-Leafs Side Opening Permanent Magnet Synchronous Door Operator SO800,(Left Opening+ right opening) beam installation,PM,with sill 1.0000
Light Curtain Light Curtain WECO-917E71- AC220 5.0000
Polyurethane Buffer Polyurethane Buffer φ80×100 20.0000
Elevator Display Elevator Display 4.3’ 60.0000
Elevator LOP Elevator LOP Up Button/Up+Down Button/Down Button 30.0000
Elevator Inverter Elevator Inverter 15KW 2.0000
Elevator Inverter Elevator Inverter 11KW 2.0000
Elevator Inverter Elevator Inverter 5.5KW 2.0000
Elevator COP Elevator COP floor:5 blue 24v with_Braille SN-PB35(pcs:9) 1.2.3.4.5 |-|SN-CCB-L-SX Command Board:MCTC-CCB-A 5.0000
Elevator COP Elevator COP floor:5 blue 24v with_Braille SN-PB35(pcs:9) 1.2.3.4.5 |-|SN-CCB-L-SX Command Board:MCTC-CCB-A 5.0000
Elevator COP Elevator COP floor:4 blue 24v with_Braille SN-PB35(pcs:8) 1.2.3.4 |-|SN-CCB-L-SX Command Board:MCTC-CCB-A 10.0000
Elevator COP Elevator COP floor:4 blue 24v with_Braille SN-PB35(pcs:8) 1.2.3.4 |-|SN-CCB-L-SX Command Board:MCTC-CCB-A 5.0000
Elevator COP Elevator COP floor:3 blue 24v with_Braille SN-PB35(pcs:7) 123 |-|SN-CCB-L-SX Command Board:MCTC-CCB-A 10.0000

Avis clients

PT DWANDRA

The elevator's rails are very smooth, run without noise, and feel very stable.

2023-09-29 16:00:00.0
ZH-ENG Admin Reply: Thanks for the great review! We have always paid attention to product quality and user experience, and we are happy that you are satisfied. If you have any needs, please feel free to contact us!
2023-10-01 04:01:19.0
Retour à la liste des projets
Contact via WhatsApp