Construction
HEALTH SECTOR PROJECTS
Linson in Health Sector Projects;
- As a manufacturer and contractor, Linson completes the construction of turnkey fully-fledged hospitals, clinics, infirmaries, mobile hospitals, mobile clinics, field hospitals etc. in every geography where effective and beneficial health services are needed.
- It completes the 16-storey (400 + 46) -bed Reinforced Concrete Training Hospital Project on a turnkey basis with traditional construction methods including all equipment in Basra, Iraq.
- It completed 4 general hospital projects with 160 bed capacity in Venezuela using hybrid construction method (Reinforced Concrete and Steel).
- It completes mobile surgical hospitals and first aid and emergency response station projects for the Ministries of Health, NATO, Defense Ministries, UN and NGOs in different parts of the world.
EDUCATION SECTOR PROJECTS
Linson in Education Sector Projects;
- In different regions of different countries and in any kind of geographical conditions, where high organizational skills are required; Linson is one of the first company that come to mind in the Education sector with its turnkey solutions, including infrastructure and superstructure for schools, classrooms, training centers.
- For the Ministry of National Education of Turkish Republic, 154 unparalleled prefabricated school and classroom projects are completed in different fields of 81 provinces of Turkey at same time. Linson undertook manufacturing, engineering, substructure and superstructure, equipment and furniture works.
- In the past 20 years, in more than 30 countries, many school, classroom and kindegarten projects have been completed on a turnkey basis using prefabricated modular building systems.
HOUSING PROJECTS
- Rapid Prefabricated Modular Mass Housing Projects
The most practical way to meet the emerging need for housing in cities due to the increasing population is the Rapid Prefabricated Modular Mass Housing Projects in which Linson Building System is used. These projects are oriented toward lower and middle income people in order to economically contribute to their social life with affordable prices.
- Low Cost Prefabricated Modular Housing Projects
Low-cost prefabricated modular housing projects of Linson; It is a housing construction method that reduces the cost with effective budgeting thanks to advanced skills and technology without compromising the robustness, performance and service life of the building. Since these projects are completed for low and middle income people, they also contribute to their social life with affordable prices.
- Medium and High Quality Housing Projects
Medium and High Quality Prefabricated Modular Housing project of Linson, is a quality oriented housing type that is a combination of high-level quality and affordable costs in the main building components such as heating-cooling, exterior and interior wall coverings, roof, lighting, floor covering, doors, windows, comfort, design. It is the most preferred residential building method.
HOTEL PROJECTS
Linson in Hotel Projects;
- Thanks to new generation building materials, fabrication methods and technologies, hotels and tourist accommodation structures that keep up with all kinds of geographical conditions and protect cultural texture are built with modular steel prefabricated building systems..
- Linson completed the Duqm City Hotel project, which is a three-star hotel project located in the industrial zone of Oman, which has been rapidly developing since 2010. Prefabricated Modular Light Steel and Heavy Steel Systems were used for the construction of the project. Project was completed according to the desert climate with a temperature resistance of +50 degrees. Linson carried out its design, superstructure, infrastructure and supply processes. The hotel has a total capacity of 120 beds and was completed in a short period of 180 days. In accordance with the request of the employer, reinforced concrete building appearance was preferred for the adaption to the architectural texture of Oman.
WAREHOUSES and HANGARS
Warehouses and hangars completed with Linson’s light and heavy steel structure systems are designed to process raw materials, products and all kinds of production items or use them specifically for purpose. These structures are frequently preferred by manufacturers, importers, exporters, wholesalers, shipping companies, customs etc. due to their high quality, reasonable cost and short construction period.
WATER TREATMENT FACILITY PROJECTS
- For the mega living and settlement facilities, village and town projects, worker and accommodation camps completed within the scope of Water Infrastructure Projects; Linson, as a contractor, realizes projects such as water supply, drainage and ventilation, hot-cold water systems, waste water treatment and storage, and sewage water treatment. In addition, within the scope of water treatment facility projects in Iraq, many steel construction water tank sheds and hangar projects have been completed.
Projects
Tasmania Reports More Than 280 Modular Homes Delivered: What Scale-Up Buyers Should Verify
Tasmania reports more than 280 modular homes delivered and a further 271 units in its construction pipeline. This procurement guide explains how buyers can verify production capacity, compliance evidence, transport readiness and repeatable quality at program scale.
Schindler Will Modernize 31 Elevators at New York’s General Motors Building: A Buyer Control Plan
Schindler says it will modernize 31 elevators at the 50-story General Motors Building in Manhattan and add destination dispatch. This guide focuses on retained-building interfaces, phased outages, security integration, testing and handover.
TK Elevator Opens Brazil Product Development Center: What Buyers Should Require from Connected Elevators
TK Elevator opened a global product development center in Guaiba, Brazil, focused on next-generation elevators, digital products and connected services. This buyer guide turns the announcement into practical requirements for software governance, interoperability, cybersecurity and lifecycle acceptance.
NSW Moves Its Modern Methods of Construction Program to Tender: What International Manufacturers Must Prove
New South Wales says the expression-of-interest stage for its Modern Methods of Construction Industry Expansion Program has closed and shortlisted applicants will move to binding proposals. This brief explains the evidence international manufacturers should prepare for capacity, compliance and delivery.
Schindler Modernizes 23 Elevators at Shanghai Residential Community: A Low-Disruption Retrofit Guide
Schindler reported the modernization of 23 elevators serving Yipin New Building Garden in Shanghai, where residents remained on site. This guide focuses on outage planning, component scope, safety controls, resident communication and handover evidence.
Otis Wins Tianjin 117 Supertall Order: What Buyers Should Specify for 250-Plus Vertical-Mobility Units
Otis announced that it will provide more than 250 elevators and escalators for Tianjin 117 Tower. This buyer brief explains how to convert a large unit count into traffic, interface, safety, testing and lifecycle requirements for a supertall project.
Philippines Commits 100 Modular Shelter Units for Disaster Recovery: A Procurement Readiness Guide
The Philippine government said the Department of Human Settlements and Urban Development committed 100 modular shelter units for disaster-hit Jose Abad Santos. This guide focuses on site data, habitability, utilities, logistics and handover evidence for rapid-deployment shelter procurement.
Elevator Service Inc. Enters Chicago Through East Elevator Acquisition: A Buyer Due-Diligence Checklist
Elevator Service, Inc. announced its acquisition of Chicago-based East Elevator. For building owners, a service-company acquisition makes continuity, technician authorization, records transfer, parts support and responsibility mapping important procurement checks.