Construction
HEALTH SECTOR PROJECTS
Linson in Health Sector Projects;
- As a manufacturer and contractor, Linson completes the construction of turnkey fully-fledged hospitals, clinics, infirmaries, mobile hospitals, mobile clinics, field hospitals etc. in every geography where effective and beneficial health services are needed.
- It completes the 16-storey (400 + 46) -bed Reinforced Concrete Training Hospital Project on a turnkey basis with traditional construction methods including all equipment in Basra, Iraq.
- It completed 4 general hospital projects with 160 bed capacity in Venezuela using hybrid construction method (Reinforced Concrete and Steel).
- It completes mobile surgical hospitals and first aid and emergency response station projects for the Ministries of Health, NATO, Defense Ministries, UN and NGOs in different parts of the world.
EDUCATION SECTOR PROJECTS
Linson in Education Sector Projects;
- In different regions of different countries and in any kind of geographical conditions, where high organizational skills are required; Linson is one of the first company that come to mind in the Education sector with its turnkey solutions, including infrastructure and superstructure for schools, classrooms, training centers.
- For the Ministry of National Education of Turkish Republic, 154 unparalleled prefabricated school and classroom projects are completed in different fields of 81 provinces of Turkey at same time. Linson undertook manufacturing, engineering, substructure and superstructure, equipment and furniture works.
- In the past 20 years, in more than 30 countries, many school, classroom and kindegarten projects have been completed on a turnkey basis using prefabricated modular building systems.
HOUSING PROJECTS
- Rapid Prefabricated Modular Mass Housing Projects
The most practical way to meet the emerging need for housing in cities due to the increasing population is the Rapid Prefabricated Modular Mass Housing Projects in which Linson Building System is used. These projects are oriented toward lower and middle income people in order to economically contribute to their social life with affordable prices.
- Low Cost Prefabricated Modular Housing Projects
Low-cost prefabricated modular housing projects of Linson; It is a housing construction method that reduces the cost with effective budgeting thanks to advanced skills and technology without compromising the robustness, performance and service life of the building. Since these projects are completed for low and middle income people, they also contribute to their social life with affordable prices.
- Medium and High Quality Housing Projects
Medium and High Quality Prefabricated Modular Housing project of Linson, is a quality oriented housing type that is a combination of high-level quality and affordable costs in the main building components such as heating-cooling, exterior and interior wall coverings, roof, lighting, floor covering, doors, windows, comfort, design. It is the most preferred residential building method.
HOTEL PROJECTS
Linson in Hotel Projects;
- Thanks to new generation building materials, fabrication methods and technologies, hotels and tourist accommodation structures that keep up with all kinds of geographical conditions and protect cultural texture are built with modular steel prefabricated building systems..
- Linson completed the Duqm City Hotel project, which is a three-star hotel project located in the industrial zone of Oman, which has been rapidly developing since 2010. Prefabricated Modular Light Steel and Heavy Steel Systems were used for the construction of the project. Project was completed according to the desert climate with a temperature resistance of +50 degrees. Linson carried out its design, superstructure, infrastructure and supply processes. The hotel has a total capacity of 120 beds and was completed in a short period of 180 days. In accordance with the request of the employer, reinforced concrete building appearance was preferred for the adaption to the architectural texture of Oman.
WAREHOUSES and HANGARS
Warehouses and hangars completed with Linson’s light and heavy steel structure systems are designed to process raw materials, products and all kinds of production items or use them specifically for purpose. These structures are frequently preferred by manufacturers, importers, exporters, wholesalers, shipping companies, customs etc. due to their high quality, reasonable cost and short construction period.
WATER TREATMENT FACILITY PROJECTS
- For the mega living and settlement facilities, village and town projects, worker and accommodation camps completed within the scope of Water Infrastructure Projects; Linson, as a contractor, realizes projects such as water supply, drainage and ventilation, hot-cold water systems, waste water treatment and storage, and sewage water treatment. In addition, within the scope of water treatment facility projects in Iraq, many steel construction water tank sheds and hangar projects have been completed.
Projects
Sofia Council of Ministers Plans Four-Lift Replacement in an Occupied Heritage Interior
Sofia’s public tender covers survey, design, dismantling, four replacement lifts, stone-lining restoration, registration and warranty maintenance. The scope shows why finishes and statutory handover must be priced with the lift package.
Australian Government Backs a High-Capacity Advanced Housing Factory in Western Australia
A public-private investment targets an advanced housing manufacturing facility capable of more than 2,000 apartments annually. Scale makes product platforms, throughput and demand certainty decisive.
Tasmania Joins Australia’s National Housing Kit of Parts Initiative
Tasmania joined a national effort to publish common component specifications for offsite housing. Export suppliers should focus on interfaces and documented compatibility, not only module catalogues.
Honolulu Federal Building Elevator Bank Enters Phase Two Modernization
A 2026 federal delivery order advances a second elevator-bank modernization phase in Honolulu. The project highlights sequencing, retained service and tropical-site logistics rather than equipment selection alone.
Canada Prequalifies Teams for Place du Portage III Elevator Modernization
Canada’s procurement for Place du Portage III uses a qualification stage before detailed bidding. International component suppliers should prepare traceable project experience, design interfaces and local-code evidence before approaching prime contractors.
Horizon Europe 2026-2027 Targets Scalable Offsite Renovation Components: A Supplier Readiness Guide
The Horizon Europe 2026-2027 work programme identifies research needs for scalable offsite-manufactured renovation components. Suppliers should prepare interoperable data, verified interfaces and demonstrator evidence.
Census NAICS Includes On-Site Modular Home Assembly: A Classification Guide for Contractors
Census NAICS detail for 236115 includes single-family modular housing assembled on site. Companies should distinguish business classification from product compliance and licensing.
VA Requests Category 1 and Category 5 Elevator Tests: A Hospital Inspection Planning Guide
A 2026 VA solicitation requests third-party Category 5 and annual Category 1 safety testing for hospital elevators and dumbwaiters. Healthcare owners should coordinate testing with clinical continuity and defect closure.