Programme Direction

What type of solution is being sought?

Direct answer: The work programme points toward scalable offsite-manufactured components that can support customised renovation across varied buildings.

Use the European Commission work-programme document for the formal scope.

Existing-Building Data

What must be captured before manufacture?

Direct answer: Survey geometry, substrate condition, structure, moisture, fire strategy, services, access and resident constraints. Define tolerances and how field uncertainty will be absorbed.

Interface Design

Which interfaces control repeatability?

Direct answer: Standardise survey data, fixings, joints, weather seals, service connections and digital identifiers. Allow configurable dimensions without redesigning the entire system.

Demonstrator Evidence

What should suppliers measure?

Direct answer: Record installation time, defects, airtightness, thermal performance, moisture behaviour, waste, resident disruption and maintainability. State test conditions so results can be compared.

For building-level coordination, the International Building Code overview provides useful context, but the project must follow the locally adopted rules.

Related ZH-ENG Modular Building Support

What should a project inquiry include?

Direct answer: State the destination, occupancy, room schedule, climate, design loads, utilities, transport limits, installation split and approval route. Buyers can review ZH-ENG modular building solutions before confirming the project configuration.