+86 021-57676786 News Center Careers

PI-SH202303JZ1361

Vietnam

Project Overview

Sign Date
2023-03-21
Delivery Region
Vietnam
Client
SMEV
Destination Port
Project Quantity
5195.0000
Total Value
$87568.60
Privacy Notice
All client contact & pricing data is anonymized

Products In This Project

Image Product Name Specifications Quantity
Traction Machine Traction Machine Torin Gearless traction machine GTW7A, Capacity 450kg, Duty speed 60mpm, roping 2:1; rated power 3.3kw, voltage 380VAC 30.0000
Traction Machine Traction Machine Torin Gearless traction machine GTW7A, Capacity 450kg, Duty speed 90mpm, roping 2:1; rated power 4.9kw, voltage 380VAC 10.0000
Traction Machine Traction Machine Torin Gearless traction machine GTW7A Capacity 630kg, Duty speed 60mpm, roping 2:1; rated power 4.0kw, voltage 380VAC 10.0000
Traction Machine Traction Machine Torin Gearless traction machine GTW7A Capacity 630kg, Duty speed 90mpm, roping 2:1; rated power 6.0kw, voltage 380VAC 5.0000
Progressive Safety Gear Progressive Safety Gear Safety gear model LSG01 (full set for rail T78/B) 200.0000
Progressive Safety Gear Progressive Safety Gear Safety gear model LSG01 (full set for rail T89/B) 40.0000
Elevator Limit Switch Elevator Limit Switch Limited Switch QM-S3-1370 1500.0000
Arrived Charm Arrived Charm Arriving gong 400.0000
Flexible Rope Fastening Flexible Rope Fastening Rope Fastening: SN-HD8W, use for wire rope dia 8, length 350mm; active rope attachment; spring type (with 2pcs of U-clips) 3000.0000

Client Reviews

SMARTRISE VIETNAM ELEVATOR PRODUCTION

This tractor is really practical. The operation is much smoother after installation, and the safety performance is reassuring.

2023-04-20 16:00:00.0
ZH-ENG Admin Reply: Thanks for the approval! We have always paid attention to the practicality and safety of our products, and we are happy to bring you a satisfactory user experience. If you have any questions, please feel free to contact us!
2023-04-22 02:01:07.0
View All Projects
Contact via WhatsApp