Can elevator equipment be shipped in installation sequence?
وقت طرح السؤال:
2021-06-27
الإجابة
Yes. Packages can be numbered and loaded according to site priorities, but container stability, weight distribution and customs inspection must also be considered.
وقت الإجابة:
2021-06-27