+86 021-57676786 新闻中心 招贤纳士

PI-SH202311YL1287

Bangladesh

项目概况

签约日期
2023-10-31
交付地区
Bangladesh
合作客户
Nexus Power & Engineering- BD
目的港口
CHITTAGONG
项目采购数量
3.0000
项目总金额
$28850.00
隐私说明
所有客户联系方式、详细报价信息均做脱敏隐藏保护

本项目包含产品

图片 产品名称 规格参数 数量
MR Passenger Elevator MR Passenger Elevator Project Name: DD sir  MR Passenger elevator 450 kg 1.0m/s 06/06/06(G,1,2,3,4,5) 1.0000
MR Passenger Elevator MR Passenger Elevator Project Name: Sonamiya Tower  MR Passenger elevator 630 kg 1.5m/s 7/7/7(G,1,2,3,4,5,6) 1.0000
MR Passenger Elevator MR Passenger Elevator Project Name: Holly Tower MR Passenger elevator 630 kg 1.5m/s 7/7/7(G,1,2,3,4,5,6) 1.0000

客户评价

Nexus Power & Engineering- BD

This elevator is very easy to use, and you don't have to wait long to go up and down the stairs. It's perfect for a crowded neighborhood like ours.

2023-12-20 16:00:00.0
ZH-ENG Admin Reply: Thanks for the great review! We are very happy to be able to assist you and thank you for approving the product. If you have any needs, please feel free to contact us!
2023-12-21 20:00:23.0
返回全部项目
Contact via WhatsApp