+86 021-5767686 Haber Merkezi Kariyer

PI-SH202405YL0467

Bangladesh

Proje Özeti

Sipariş Tarihi
2024-05-12
Teslimat Bölgesi
Bangladesh
Müşteri
Capital lift
Hedef Liman
CHITTAGONG
Proje Miktarı
15000.0000
Toplam Tutar
$4500.00
Gizlilik Uyarısı
Tüm müşteri iletişim ve fiyat verileri anonimleştirildi

Bu Projede Kullanılan Ürünler

Görsel Ürün Adı Teknik Özellikler Miktar
Elevator Wire Rope Elevator Wire Rope Fiber Core 8MM with customized logo 15000.0000

Müşteri Yorumları

Capital lift

The quality of this elevator wire rope is very real. After installation, it feels very stable, and the noise is quite low, so you can use it without worry.

2024-06-20 16:00:00.0
ZH-ENG Admin Reply: Thanks for the approval! We have always paid attention to product quality and user experience, and we are happy to bring you safe and reliable elevator accessories. If necessary, please feel free to contact us!
2024-06-22 03:00:42.0
Tüm Projelere Dön
Contact via WhatsApp