+86 021-5767686 Haber Merkezi Kariyer

PI-SH202404YL0367

Bangladesh

Proje Özeti

Sipariş Tarihi
2024-04-15
Teslimat Bölgesi
Bangladesh
Müşteri
Nexus Power & Engineering- BD
Hedef Liman
CHITTAGONG
Proje Miktarı
1.0000
Toplam Tutar
$11600.00
Gizlilik Uyarısı
Tüm müşteri iletişim ve fiyat verileri anonimleştirildi

Bu Projede Kullanılan Ürünler

Görsel Ürün Adı Teknik Özellikler Miktar
MR Passenger Elevator MR Passenger Elevator Brand: Original Fuji Nihon MR passenger lift Project name: DABI MOULIK UNNAYAN.SANGSTHA Capacity-630kg Speed-1.0m/s Floor Number-6(G,1-5) Guide rail: Factory standard model 1.0000

Müşteri Yorumları

Nexus Power & Engineering- BD

This elevator is very easy to use, and you don't have to wait long to go up and down the stairs. It's perfect for a crowded neighborhood like ours.

2024-05-19 16:00:00.0
ZH-ENG Admin Reply: Thanks for the great review! We are very happy to be able to assist you and thank you for approving the product. If you have any needs, please feel free to contact us!
2024-05-20 23:00:36.0
Tüm Projelere Dön
Contact via WhatsApp