+86 021-5767686 Haber Merkezi Kariyer

PI-SH202401YL0024

Bangladesh

Proje Özeti

Sipariş Tarihi
2024-01-10
Teslimat Bölgesi
Bangladesh
Müşteri
Capital lift
Hedef Liman
CHITTAGONG
Proje Miktarı
65000.0000
Toplam Tutar
$19600.00
Gizlilik Uyarısı
Tüm müşteri iletişim ve fiyat verileri anonimleştirildi

Bu Projede Kullanılan Ürünler

Görsel Ürün Adı Teknik Özellikler Miktar
Elevator Wire Rope Elevator Wire Rope Natural Fiber Core 6.5MM with customized logo 5000.0000
Elevator Wire Rope Elevator Wire Rope Fiber Core 8MM with customized logo 55000.0000
Elevator Wire Rope Elevator Wire Rope Fiber Core 10MM with customized logo 5000.0000

Müşteri Yorumları

Capital lift

The quality of this elevator steel wire rope is very solid. After installation, it runs very smoothly. I haven't heard any abnormal noise, and it hasn't been a problem even after using it for a while. It's very reliable.

2024-02-29 16:00:00.0
ZH-ENG Admin Reply: Thanks for the approval! We have always paid attention to product quality and service, and we are happy that you are satisfied with your use. If you have any further needs, please feel free to contact us!
2024-03-01 13:01:12.0
Tüm Projelere Dön
Contact via WhatsApp