+86 021-5767686 Haber Merkezi Kariyer

PI-SH202207BC0578

Pakistan

Proje Özeti

Sipariş Tarihi
2022-03-08
Teslimat Bölgesi
Pakistan
Müşteri
SAMI
Hedef Liman
Proje Miktarı
2.0000
Toplam Tutar
$2400.00
Gizlilik Uyarısı
Tüm müşteri iletişim ve fiyat verileri anonimleştirildi

Bu Projede Kullanılan Ürünler

Görsel Ürün Adı Teknik Özellikler Miktar
Elevator COP Elevator COP floor:5 red 24v with_Braille SN-PB313(pcs:9) B,G,1,2,3, cop全镜面 |-|SN-CCB-T7 Command Board:MCTC-CCB-A With LOGO With Color 金色 1.0000
Transom  Panel Transom Panel 售后,订单号03BC0083-1金色名牌板,给客户重做一块(原有logo掉漆) 1.0000

Müşteri Yorumları

Zawyar International

I just received it, I am very satisfied. The quality of the item is good, the packaging is careful, not damaged, the logistics are fast, and it is worth buying.

2022-04-15 16:00:00.0
ZH-ENG Admin Reply: Thanks for the great review! We are very happy that you are satisfied with the product and logistics, please feel free to contact us if you have any needs. I wish you a happy life!
2022-04-16 22:00:50.0
Tüm Projelere Dön
Contact via WhatsApp