+86 021-57678686 Centro Notizie Lavora con noi

PI-SH202308SJ3313

Indonesia

Panoramica progetto

Sign Date
2023-08-29
Area consegna
Indonesia
Cliente
PT. Zenji ELEVATOR NUSANTARA
Porto destinazione
Quantità progetto
5050.0000
Importo totale
$4195.00
Avviso privacy
Tutti contatti e prezzi clienti anonimizzati

Prodotti utilizzati nel progetto

Immagine Nome prodotto Specifiche Quantità
Gustav Wolf Wire Rope Gustav Wolf Wire Rope 8MM~12MM 1000.0000
Gustav Wolf Wire Rope Gustav Wolf Wire Rope 8MM~12MM 3000.0000
Extension Intercom Inside Extension Intercom Inside Extension inside COP 50.0000
Elevator Oil Can Elevator Oil Can Toshiba Oil Can 1000.0000

Recensioni clienti

PT. Zenji ELEVATOR NUSANTARA

This elevator fuel tank is very easy to use. It doesn't leak when refueling, and the quality is good.

2023-10-08 16:00:00.0
ZH-ENG Admin Reply: Thanks for the approval! We are happy that you are satisfied with the product, and we will continue to work hard to provide you with better products and services.
2023-10-10 04:00:26.0
Torna a tutti i progetti
Contact via WhatsApp