+86 021-57676786 News Center Careers
Back to FAQ list

What is included in a standard elevator quotation?

Ask Time: 2023-11-07
Answer
A quotation should identify equipment scope, specifications, quantity, price, terms, lead time, warranty, exclusions, documents and quotation validity.
Answer Time: 2023-11-07

Derived Questions

Regarding “What is included in a standard elevator quotation?”, how can technical bids be compared on the same basis?
Issue a compliance schedule and require every bidder to mark compliance, deviation, exclusion and alternative against each requirement.
Ask Time: 2023-11-10 Answer Time: 2023-11-11
Regarding “What is included in a standard elevator quotation?”, which logistics terms must be clear in the purchase order?
Define Incoterm and named place, packing, readiness notice, documents, insurance, loading, customs data, demurrage risk and delivery interface.
Ask Time: 2023-11-07 Answer Time: 2023-11-08
Regarding “What is included in a standard elevator quotation?”, which project data should be fixed before issuing the RFQ?
Freeze location, use, quantities, travel, stops, shaft geometry, capacity, speed, doors, standards, finishes, interfaces and required dates.
Ask Time: 2023-11-09 Answer Time: 2023-11-09
Regarding “What is included in a standard elevator quotation?”, what supplier evidence should be reviewed before award?
Review comparable references, factory capability, quality controls, certificates, engineering team, testing, traceability and after-sales resources.
Ask Time: 2023-11-13 Answer Time: 2023-11-13
Regarding “What is included in a standard elevator quotation?”, which quotation exclusions often create later cost increases?
Check freight, duties, installation, testing, certification, builder’s work, power, scaffolding, tools, travel, commissioning and spare parts.
Ask Time: 2023-11-11 Answer Time: 2023-11-12
Regarding “What is included in a standard elevator quotation?”, how should total lifecycle cost influence supplier selection?
Compare energy, planned maintenance, consumables, spare-part pricing, technical access, downtime, modernization and expected service life alongside purchase price.
Ask Time: 2023-11-08 Answer Time: 2023-11-08
Contact via WhatsApp