+86 021-57676786 Nachrichtencenter Karriere

PI-SH202405OV1031

Bangladesh

Projektübersicht

Bestelldatum
2024-05-09
Lieferregion
Bangladesh
Kunde
CREST ASSIK
Zielhafen
Projektmenge
5100.0000
Gesamtsumme
$3250.00
Datenschutzhinweis
Alle Kundenkontakt- und Preisdaten sind anonymisiert

In diesem Projekt enthaltene Produkte

Bild Produktname Spezifikation Menge
Hollow Guide Rail Hollow Guide Rail SN-TK5A pcs:1 Fish Plate-TK5Apcs: 1 Clip-TK5A pcs: 6 Bolts-T-Clips-TK5Apcs: 8 50.0000
Guide Rail Guide Rail SN-T75/B pcs:1 Fish Plate-T75/Bpcs: 1 T-Clips-T75/B pcs: 6 Bolts-T75/Bpcs: 8 50.0000
Elevator Anchor Elevator Anchor M12*100 golden 5000.0000

Kundenbewertungen

CREST LIFT

The elevator ran much more smoothly after installing this rail. It was always a bit shaky before, but now it is very stable, and the manufacturer's workmanship is very real.

2024-06-25 16:00:00.0
ZH-ENG Admin Reply: Thanks for the approval! We have always focused on product quality and user experience, and we are happy to help you. If you have any other questions, please feel free to contact us!
2024-06-27 04:01:20.0
Zurück zu allen Projekten
Contact via WhatsApp